Welcome
to affordableconcretecutters.net
“We
Specialize in Cutting Doorways and Windows in Concrete Foundations”
Are You in Hollis New Hampshire? Do You
Need Concrete Cutting?
We Are Your Local
Concrete Cutter
Call 603-622-4440
We Service Hollis NH
and all surrounding Cities & Towns
“No Travel Charges – Ever! Guaranteed!”
Exotic Hollis, New Hampshire Cultural Tour With Unique Cultural Attractions!
Hollis is one of the town in Hillsborough territory, new Hampshire, US. The population was around 7684 as per the 2010 census made. The city center village is mentioned on National register of historic locations as Hollis village historic neighborhood.
Fascinating facts about Hollis town you may not know
Town name: As per the Samuel T. Worcester’s history that was commissioned by the city selectmen during 1878, the city was included in province of New Hampshire during 3rd April 1746 to possess continence forever by name of Holle’s…
Worcester defends that, at the period of Charter, Governor called Benning Wentworth was beholden to Thomas Pelham Holle’s, the initial Duke of Newcastle for his meeting as governor. As per the Worcester, it was much the custom with governor Benning to name cities in honor of his buddies as well as patrons. Therefore in the same annum, the city’s of Holle’s and Pelham were included and titled after the duke. Worcester quotes a Mr. Bancroft who,
“in his past, states of him (Newcastle) which he was of so feeble ahead, and so traitorous a heart that Sir Robert called his name as Perfidy that noble Halifax utilized to revile him as fool and knave, and that he was so uneducated of this continent, which it was stated of him, that he directed his letters to Island of New England.
Thomas Hollis was a main benefactor of college Harvard. As per the Worcester, regard the year 1775, city records began appearing with city’s title spelled as Hollis, after the Thomas Hollis. Both spellings were utilized regard 1815, after that only the title Hollis appears whilst holles the label of Newcastle duke has passed into deserved oblivion.
Some of the notable facts about the town Hollis
The following is from the Worcester’s past of Hollis:
• When the town was included, the city tax list consists of 54 families.
• By the year 1760, that count has increased to across 105 families.
• During 1767, 2 of 384 slaves in NH resided in Hollis. During 1775, 4 of 656 slaves in NH lived in Hollis.
• The initial trial for killing in Hillsborough territory was of Israel Wilkins Jr, of town Hollis, for the killing of his dad, Israel Wilkins Sr, on 2nd Nov during 1772. The senior Wilkins expired of A blow upon head of the length 3 inches and depth of 1 inch. Wilkins Jr was noticed guilty of man-slaughter, requested perk of clergy and was subsequently branded upon thumb with letter T and forced to penalty all his goods to king.
We perform concrete
cutting, core drilling and coring in Hollis New Hampshire.
The
recognition of this principle has sometimes resulted in designing retaining concrete
walls on the principle illustrated in Fig. 69, which is somewhat similar to a.
section of an arch set on end. Such curved outlines, of course, are more
expensive, and are sometimes inconvenient, and for that reason are but seldom
adopted. A detail which is frequently adopted in the design of retaining concrete
walls is to use what is virtually a batter to the rear face of the concrete
wall, but to accomplish this by a series of steps on the rear of the concrete
wall. This not only permits the use of rectangular concrete blocks of stone and
the employment of vertical joints, but also adds considerably to the stability
of the concrete wall, since the vertical pressure of the earth on the horizontal
steps adds considerably to the resistance to overturning. In Fig. 70 is shown a
design for a retaining concrete wall made to support a railway embankment in a
location where the natural surface was so steep that the embankment would not
readily obtain sufficient support. Although this use of a retaining concrete
wall is somewhat special, the general outline of the design not only conforms
to the standards on that railroad, but represents good practice and is an
illustration of many of the points referred to above. It should be noted that
in this case the total width of the base of the concrete wall is nearly
one-half the height. The outline design of a long concrete bridge which
requires several spans, involves many considerations: (1) if the river is
navigable, at least one deep and wide channel must be left for navigation. The
placing of concrete piers, the clear height of the spans above high water, and
the general plans of all concrete bridges over navigable rivers, is subject to
the approval of the United States Government. (2) A long concrete bridge always
requires a solution of the general question of few concrete piers and long
spans, or more concrete piers and shorter spans. No general solution of the
question is possible, since it depends on the required clear height of the
spans above the water, on the required depth below the water for a suitable concrete
foundation, and on several other conditions (such as swift current, etc.) which
would influence the relative cost of additional concrete piers or longer spans.
Each case must be decided according to the particular circumstances of the
case. (3) Even the general location of the line of the concrete bridge is often
determined by a careful comparison, not only of several plans for a given
crossing, but even a comparison of the plans for several locations. The
requirements for the concrete bridge seats for the ends of the two spans
resting on a concrete pier are usually such that a concrete pier with a top as
large as thus required, and with a proper batter to the faces, will have all
the strength necessary for the external forces acting on the concrete pier. For
example, the channel concrete pier of one of the large railroad concrete bridges
crossing the Mississippi River was capped by a course of stonework 14 feet wide
and 29 feet long, besides two semicircles with a radius of 7 feet. The footing
of this concrete pier was 30 feet wide by 70 feet long, and the total height
from subsoil to top was about 170 feet. This concrete pier, of course, was
unusually large. For trusses of shorter span, the concrete bridge seats are
correspondingly smaller. The elements which affect stability are so easily
computed that it is always proper, as a matter of precaution, to test every concrete
pier designed to fulfill the other usual requirements to see whether it is
certainly safe against certain possible methods of failure. This is especially
true when the concrete piers are unusually high. The requirements for
supporting the truss are, fortunately, just such as give the concrete pier the
most favorable formation so that it offers the least obstruction to the flow of
the current in the river.
Are You in Hollis New Hampshire? Do You
Need Concrete Cutting?
We Are Your Local
Concrete Cutter
Call 603-622-4440
We Service Hollis NH
and all surrounding Cities & Towns